Aquatic Centre

Scaffold:

Evan Jones Construction needed to get access to form the ceiling of the new Aquatic Centre.  The scaffold was built two and a half times for the three stages, and the scaffold ranged from 6.5 to 10.5 metres high x 31m deep x 30m wide.
 

 
Aquatic_Scaff_Apr11_1.JPG  Aquatic_Scaff_Apr11_2.JPG   March 2011
 


 

Propping:

The following photos show Scaffold Marlborough's propping of the new roof structure from the bottom of one of the new swimming pools.  The Marlborough District Council redevelopment of Blenheim's Aquatic Centre started early in 2010, and the first stage being the new indoor pools opened in June 2011.  The second stage being the redevelopment of the old indoor pools, and the construction on the new outdoor pools is scheduled to be complete by December 2011, the main contractor on the project is Evan Jones Construction.

 
Blenheim_Aquatic_Centre_532_1.jpg  Sept 2010
Blenheim_Aquatic_Centre_535.jpg  Blenheim_Aquatic_Centre_528.jpg  Blenheim_Aquatic_Centre_529.jpg
Blenheim_Aquatic_Centre_531.jpg  Blenheim_Aquatic_Centre_533.jpg

We Service Marlborough and Beyond

Based in Blenheim, we not only service the Marlborough region, but the whole top of the South Island.
Find out more
p_9.gif

About Us

Scaffold Marlborough is a Blenheim based scaffolding company, consisting of a team of qualified scaffolders, using the Layher scaffolding systems.
Find out more

Contact Us

021 390 039

Rob Hellstrom

Burleigh Industrial Estate
New Renwick Rd
Blenheim 7201
New Zealand
P  03 578 2329 
rob@scaffoldmarlborough.co.nz